Structural Rebuild covers load-bearing repair through final inspection, coordinated with your Affton building department at every stage.
📞 Call +1-866-484-1409 Now
Full GC oversight, not subcontracted piecemeal.
Load-bearing repairs meet current Affton, MO building code.
Change orders require your written approval.
We keep the project moving on a schedule you can plan around.

Load-bearing walls rebuilt to current Affton, MO code.
Signed off by a structural engineer when warranted.
All required permits filed with your local Affton building department.
Begins only after structural work is signed off.
Where a rebuild starts looking like a home again.
Certificate of occupancy coordinated with Affton inspectors.
A technician answers and lines up a structural evaluation.
A project lead arrives to evaluate structural scope in person.
Full rebuild scope documented with a written price and schedule.
Nothing closes out until final inspection passes.
"Passing structural inspection on the first attempt said a lot about the work quality." — Homeowner, Affton
"Not dealing with the permitting office directly saved us a lot of stress." — Homeowner, Affton, MO
"The project stayed on the schedule they gave us at the start, which surprised us given the scope." — Homeowner, Affton
Included as part of the standard scope.
Timeline varies with damage extent.
Licensed to manage the complete construction process.
When damage warrants it, engineer sign-off is included.
We provide the paperwork adjusters need.
Our Structural Rebuild teams cover Affton and the surrounding zip codes, with licensed GC oversight on every project.
